Mitigating Schedule and Cost Overrun Risks in EPC Projects Using Monte Carlo Simulation in Ikeja
2026ABUAD Journal of Engineering Research and Development (AJERD)JournalOpen access
10.53982/ajerd.2026.0902.19-jFull text0 citations
2026ABUAD Journal of Engineering Research and Development (AJERD)JournalOpen access
10.53982/ajerd.2026.0902.19-jFull text0 citations
3 authors.
as printed: Adefemi Omowole Adeodu
Assignment is probabilistic — a work belongs to several fields in proportions.
Several sources describing one work is the point — it means the record rests on more than one authority.
2026 · ABUAD Journal of Engineering Research and Development (AJERD) · 0 citations
https://openalex.org/W7203707891