Impact of Work-In-Progress (WIP) Inventory Costs on Engineering Products Manufacturing Performance
2026Iconic Research and Engineering JournalsJournalOpen access
10.64388/irev9i8-1714329Full text0 citations
2026Iconic Research and Engineering JournalsJournalOpen access
10.64388/irev9i8-1714329Full text0 citations
4 authors across 2 institutions in 1 country.
as printed: Osita Obiukwu
Assignment is probabilistic — a work belongs to several fields in proportions.
Several sources describing one work is the point — it means the record rests on more than one authority.
2026 · Iconic Research and Engineering Journals · 0 citations
https://openalex.org/W7130374047