Simultaneous allocation of distributed generation and shunt capacitor using multi-objective mountain gazelle optimizer for technical and economic benefits
2025Engineering Research ExpressJournal
10.1088/2631-8695/ae1d19Full text0 citations
2025Engineering Research ExpressJournal
10.1088/2631-8695/ae1d19Full text0 citations
4 authors across 2 institutions in 1 country.
as printed: Oluwaseyi Wasiu Adebiyi
Assignment is probabilistic — a work belongs to several fields in proportions.
Several sources describing one work is the point — it means the record rests on more than one authority.
2025 · Engineering Research Express · 0 citations
https://openalex.org/W4416015572