Modelled Energy Cost Minimization Solution for Wireless Rechargeable Sensor Networks
2025ABUAD Journal of Engineering Research and Development (AJERD)JournalOpen access
10.53982/ajerd.2025.0801.09-jFull text0 citations
2025ABUAD Journal of Engineering Research and Development (AJERD)JournalOpen access
10.53982/ajerd.2025.0801.09-jFull text0 citations
4 authors across 2 institutions in 1 country.
as printed: Dominic Saaityo NYITAMEN
Assignment is probabilistic — a work belongs to several fields in proportions.
Several sources describing one work is the point — it means the record rests on more than one authority.
2025 · ABUAD Journal of Engineering Research and Development (AJERD) · 0 citations
https://openalex.org/W4407289394