Preventive Maintenance and Replacement Model for Mechanically Repairable Systems with Linearly Increasing Hazard Rate
2023DESIGN CONSTRUCTION MAINTENANCEJournalOpen access
10.37394/232022.2023.3.19Full text0 citations
2023DESIGN CONSTRUCTION MAINTENANCEJournalOpen access
10.37394/232022.2023.3.19Full text0 citations
2 authors.
as printed: Nse Udoh
as printed: Iniobong Uko
Assignment is probabilistic — a work belongs to several fields in proportions.
Several sources describing one work is the point — it means the record rests on more than one authority.
2023 · DESIGN CONSTRUCTION MAINTENANCE · 0 citations
https://openalex.org/W4388291086