CARS evaluation of manufacturing system under lethal and nonlethal failure (a case study of urea fertilizer plant)
2023Life Cycle Reliability and Safety EngineeringJournal
10.1007/s41872-023-00219-5Full text0 citations
2023Life Cycle Reliability and Safety EngineeringJournal
10.1007/s41872-023-00219-5Full text0 citations
4 authors.
Assignment is probabilistic — a work belongs to several fields in proportions.
Several sources describing one work is the point — it means the record rests on more than one authority.
2023 · Life Cycle Reliability and Safety Engineering · 0 citations
https://openalex.org/W4382399197