CONSTRAINTS OF PROJECT MANAGEMENT IN THE NIGERIAN CONSTRUCTION INDUSTRY
2024Journal of Engineering Studies and ResearchJournalOpen access
10.29081/jesr.v29i4.001Full text1 citations
2024Journal of Engineering Studies and ResearchJournalOpen access
10.29081/jesr.v29i4.001Full text1 citations
3 authors.
as printed: OLUFIKAYO ADERINLEWO
as printed: SUNMBO AKANDE
Assignment is probabilistic — a work belongs to several fields in proportions.
Several sources describing one work is the point — it means the record rests on more than one authority.
2024 · Journal of Engineering Studies and Research · 1 citations
https://openalex.org/W4392503086