Toward predictive modelling of construction cost overruns using support vector machine techniques
2023Cogent EngineeringJournalOpen access
10.1080/23311916.2023.2269656Full text9 citations
2023Cogent EngineeringJournalOpen access
10.1080/23311916.2023.2269656Full text9 citations
2 authors across 2 institutions in 2 countries.
as printed: G.H. Coffie
as printed: S.K.F. Cudjoe
Assignment is probabilistic — a work belongs to several fields in proportions.
Several sources describing one work is the point — it means the record rests on more than one authority.
2023 · Cogent Engineering · 9 citations
https://openalex.org/W4387668532