Optimal Circular Balanced Repeated Measurements Designs for v = p through the Method of Cyclic Shift (MCS) Rule II
2022Mathematical Problems in EngineeringJournalOpen access
10.1155/2022/2875183Full text0 citations
2022Mathematical Problems in EngineeringJournalOpen access
10.1155/2022/2875183Full text0 citations
5 authors across 3 institutions in 2 countries.
Assignment is probabilistic — a work belongs to several fields in proportions.
Several sources describing one work is the point — it means the record rests on more than one authority.
2022 · Mathematical Problems in Engineering · 0 citations
https://openalex.org/W4302424523