Unlocking the full potential of reality capture for construction project cost monitoring: a mixed review
2024Journal of Engineering Design and TechnologyJournal
10.1108/jedt-05-2022-0231Full text4 citations
2024Journal of Engineering Design and TechnologyJournal
10.1108/jedt-05-2022-0231Full text4 citations
3 authors across 3 institutions in 3 countries.
Assignment is probabilistic — a work belongs to several fields in proportions.
Several sources describing one work is the point — it means the record rests on more than one authority.
2024 · Journal of Engineering Design and Technology · 4 citations
https://openalex.org/W4390764022